The new center will be a modern, flexible venue capable of accommodating a range of performances and events, supporting both campus programming and broader community use. | Photo Credit: Sundt Construction
- The听San Diego Community College District鈥檚听Saville Performing Arts Center Replacement project at San Diego City College听has moved into the schematic design phase.听
- The project will replace the existing Saville Theatre with a new performing arts facility of about听28,000 square feet听designed for academic programs and community use.听听
- Scope includes demolition, hazardous materials abatement, utility听relocation听and upgrades, plus site improvements including new walkways and ADA-compliant paths of travel.听
- The work is part of the Measure HH Bond Program, approved in November 2024, totaling听$3.5 billion.听
SAN DIEGO 鈥斕齌he Saville Theatre Replacement Project听at听, part of the district鈥檚 Measure HH Bond Program,听has听officially moved听from the programming phase into schematic design.听The project will replace the existing Saville Theatre with a new,听approximately 28,000-square-foot听performing arts facility designed to support academic programs and community use.
The new center will be a modern, flexible venue capable of accommodating a range of performances and events, supporting both campus programming and broader community use.听The听programming听process brought together听faculty听and听staff听members, who听joined the听Design-Build team of听听and听听for听a series of workshops and discussions听to help shape the project vision, offering insights on听instructional needs,听room configurations, and听how听to best听support teaching,听learning听and live performance.听听
Work听will include听the abatement, demolition, and removal of the existing Saville Theatre and the removal and replacement of associated site utilities and appurtenances in alignment with the campus鈥檚 Master Plan.听New construction of approximately 20,000 assignable square feet (ASF) includes a street-level lobby with Box Office, restrooms, and manager鈥檚 office. A听mew听main theatre will include 250鈥350 seats, including stage, orchestra听pit听and control room as well as a scene shop and costume shop. Other support spaces include rehearsal rooms, recording/editing听spaces听and dance studios.听听
Planned exterior work also includes new walkways, sustainable landscaping and irrigation, signage听and ADA-compliant paths of travel听that will connect to a future outdoor听amphitheatre.听
鈥淲e are honored to continue our partnership with the San Diego Community College District (SDCCD) on this important project,鈥 said Ryan Nessen,听Senior听Vice听President听and California听District听Manager, according to听a press release from Sundt Construction.听听
鈥淭his selection reflects the trust we have built over more than two decades and our commitment to delivering high-quality facilities that serve students and the broader community,鈥 Nessen听added.听
Measure HH, approved in November 2024, is a听$3.5 billion听bond program that will provide听state-of-the-art听educational facilities, address long-deferred maintenance needs, and support accessibility and equity across the district鈥檚 colleges.听
The project team also includes structural engineering firm KPFF, civil engineer Latitude 33, and mechanical and electrical engineer MA Engineers/Johnson Consulting Engineers.听

